Brick-work in third floor

Installation of framing on third floor.

Messy first floor after the fireproofing spray work. All floors experienced similar conditions.

jmc expansion project v2 slide 1

Bricks will be installed over the blue sheet on third and fourth floor.

jmc expansion project v2 slide 2

Installation of thermal insulation pad  on the roof.

img 3415 1

Six outdoor AC unit installed on third floor will control temperature of 1st floor, 2nd floor and basement. 

img 3156

Structural work for fourth floor.

img 3189

Concrete curing on third floor.

Concrete pouring on third floor.

Lifting of steel beam with gaint crane.

A Joyful moment when the wall between two sections of the masjid was opened first time.

Concrete pouring for tie beam in basement.