Brick-work in third floor
Installation of framing on third floor.
Messy first floor after the fireproofing spray work. All floors experienced similar conditions.
Bricks will be installed over the blue sheet on third and fourth floor.
Installation of thermal insulation pad on the roof.
Six outdoor AC unit installed on third floor will control temperature of 1st floor, 2nd floor and basement.
Structural work for fourth floor.
Concrete curing on third floor.
Concrete pouring on third floor.
Lifting of steel beam with gaint crane.
A Joyful moment when the wall between two sections of the masjid was opened first time.
Concrete pouring for tie beam in basement.